Hewn Log Homes — Since 1998
0
months avg. build time
from permit to CO
0
logs per home
hand-peeled, hand-scribed
0
structural inspections
before walls close
0
hidden costs
line-item bids only

Every joint. Every cost.
Every month. Visible.

We build handcrafted log homes the way timber should be worked — each log scribed by hand, each cost written down before a single tree falls.

01 — Honest Comparison

Four Methods. Real Numbers. No Spin.

We don't rig this table to make handcrafted win every row. Stick-built is faster and cheaper to build.Timber frame insulates better. The honesty is the point — you deserve to know what you're buying.

Amber column = Hewn's method
Metric
Full-Scribe Handcrafted
Hewn method
Milled Log
D-log / round
Timber Frame
Post & beam
Stick-Built
Conventional
Cost per sq. ft.
USD (2026)

Includes shell only, excludes site work

$285–$340
Custom labor intensive
$195–$245
$250–$320
$140–$185
Wall R-Value
Thermal resistance

Log mass provides thermal lag, not just R-value

R-9 + thermal mass
Mass effect adds ~R-3 equivalent
R-9 to R-11
R-24 to R-40
SIP panels required
R-13 to R-21
Settling allowance
% of wall height

Green log homes settle as wood dries — must be engineered for

3–6%
Scribing compensates at corners
2–4%
< 1%
Dried timber, minimal movement
< 0.5%
Maintenance — decade 1
Annual avg. cost

Staining, chinking, UV protection

$800–$1,400/yr
Stain every 3–5 yrs
$1,200–$2,000/yr
More exposed surface area
$400–$700/yr
$300–$600/yr
Build timeline
Months permit to CO

Highly site-dependent; remote sites add 2–4 months

12–18 mo.
8–14 mo.
10–16 mo.
6–10 mo.
Lifespan (well-maintained)
Years

Old-growth handcrafted homes regularly exceed 200 years

80–200+ yrs
Scandinavia examples: 400+ yrs
50–80 yrs
80–150 yrs
40–60 yrs
Resale premium
vs. comparable sq. ft.

Appraisal data, rural markets, 2022–2025

+18–32%
+8–15%
+12–22%
Baseline
Customization level
Design flexibility

Every handcrafted home is a one-of-one

Unlimited
Each log placed by decision
Moderate
Package-based constraints
High
High

* All figures are ranges based on 2024–2026 North American market data. Your site, species selection, and finish level will shift these numbers. Click any row for context.

Ready to price out your specific build?

Our estimates are free, detailed, and binding — line-item before you sign.

02 — Build Journey

Standing Tree to Certificate of Occupancy. Real Costs.

Twelve phases. Twelve real line-item cost ranges. No asterisks that lead to footnotes that lead to phone calls. A 1,800 sq. ft. full-scribe home in the Mountain West typically falls in the range below.

Shell total range
$182,400 – $324,200
1,600–2,200 sq. ft. shell only
Freshly felled Douglas fir logs stacked in a forest clearing, bark still on, cut ends showing growth rings
Phase 01
Western Red Cedar / Douglas Fir
01
2–3 weeks

Timber Harvest & Selection

We walk your site or a local timber stand with you. Every log is hand-selected for species, diameter, and straightness. Western red cedar and Douglas fir are our primaries — we reject anything with spiral grain.

Phase cost
$8,200–$14,000
What's included

Includes felling, limbing, skidding, and rough sort

A craftsman using a drawknife to peel bark from a cedar log, fresh white wood exposed, shavings on the ground
Phase 02
02
6–8 months

Peeling & Drying

Every log is peeled by hand with a drawknife. No mechanical debarkers. The grain patterns revealed tell us how each log wants to sit in the wall. Logs are stickered and air-dried minimum 6 months.

Phase cost
$4,800–$7,200
What's included

Labor: ~40 person-hours per cord of peeled timber

Concrete stem wall foundation with anchor bolts set in a rural forest setting, trees visible in background
Phase 03
03
3–6 weeks

Foundation & Site Prep

Log homes need a foundation that accounts for settling. We work with your structural engineer on stem walls or piers — never a slab-on-grade for a full-scribe build. Anchor bolt placement is critical.

Phase cost
$22,000–$48,000
What's included

Highly variable by soil, slope, and access. This is where site matters most.

Close-up of a scriber tool tracing the contour of a log, pencil line visible on fresh cedar wood
Phase 04
04
8–14 weeks

Log Layout & Scribing

Each log is rolled into position and scribed to the one below using a scribing tool set to the gap width. The scribe line traces the contour of the lower log exactly. Cut, test-fit, adjust. Every joint is hand-fit.

Phase cost
$38,000–$62,000
What's included

The largest labor cost in the build — this is what you're paying for

Freshly cut saddle notch on a log corner showing the curved relief cut and clean wood grain
Phase 05
05
Within scribing phase

Corner Notch Cutting

The saddle notch is cut by chainsaw and finished with a gouge and mallet. A properly cut notch bears the full weight of the log above — no spikes, no bolts. The wood does the work.

Phase cost
Included in scribing phase
What's included

Notch cutting is 30–35% of scribing labor

Crane lifting a large peeled log into position on a log home under construction, workers guiding it
Phase 06
06
3–5 days

Wall Raising

Logs go up in courses. Each course is checked for level, plumb, and bearing. We use a crane or log arch depending on site access. The wall package typically takes 3–5 days to raise once scribed.

Phase cost
$6,400–$9,800
What's included

Equipment rental + crew. Faster than you'd expect.

Log home roof structure with exposed log purlins and ridge pole, metal roofing being installed
Phase 07
07
4–6 weeks

Roof System

Ridge pole, purlins, and rafters are typically log as well — chosen for the same qualities as the wall logs. Roof loads are calculated by a licensed engineer on every project. No exceptions.

Phase cost
$28,000–$52,000
What's included

Includes log roof structure, sheathing, and metal roofing (preferred for longevity)

Large timber-framed window in a log home showing the settling space above the frame with foam gasket
Phase 08
08
2–3 weeks

Windows, Doors & Settling Spaces

Window bucks are built with a compressible gasket and slip joint — the wall settles around them, not against them. Every opening is engineered for 4–6% settling. Get this wrong and windows bind.

Phase cost
$18,000–$34,000
What's included

Window cost depends heavily on size and glazing spec. Triple-pane adds ~$8,000.

Worker applying white chinking compound between log courses on a log home exterior
Phase 09
09
2–3 weeks

Chinking & Sealing

We use Perma-Chink or Sashco products — no mortar. Chinking is applied in a backer rod and sealant system that moves with the log. Color-matched to your log species. Warranty: 25 years on material.

Phase cost
$7,200–$12,000
What's included

Material + labor. Larger gaps from green logs cost more.

Interior of log home under construction showing electrical conduit running along log wall
Phase 10
10
4–8 weeks

Mechanical, Electrical & Plumbing

Rough-in proceeds after chinking is cured. Log walls require careful planning for wire chases — we use surface-mounted raceways on interior log faces where possible. Radiant floor heat is our standard recommendation.

Phase cost
$34,000–$58,000
What's included

MEP varies enormously by size and spec. Radiant floor adds ~$12,000 to base.

Interior of finished log home showing oiled cedar log walls, stone fireplace, and timber ceiling beams
Phase 11
11
4–6 weeks

Interior Finish & Staining

Log surfaces are sanded, then finished with Sikkens or similar penetrating oil-based stain. Interior logs are typically left natural or lightly oiled. The goal is to let the wood speak.

Phase cost
$14,000–$24,000
What's included

Interior finishes vary widely by material selection. Tile vs. hardwood alone swings $8,000.

Completed handcrafted log home exterior in a forested mountain setting, winter light, smoke from chimney
Phase 12
12
1–2 weeks

Final Inspection & Certificate of Occupancy

We schedule three structural inspections before walls close and a final inspection at completion. We hand you a binder with every inspection report, warranty document, and maintenance schedule.

Phase cost
$1,800–$3,200
What's included

Inspection fees + final punch list labor. The binder is included.

These are real numbers, not marketing ranges. Costs above reflect 2024–2026 Mountain West and Pacific Northwest builds. Site work (excavation, well, septic, driveway) and interior finishes beyond base are additional and site-specific. We provide a full line-item bid before you commit to anything.

04 — Get Your Estimate

Three Questions. A Real Number.

No sales call required to see ballpark numbers. Answer three questions and we'll send you a detailed cost range within 48 hours — line-item, no asterisks.

1
2
3

Where is your build site?

Building codes, timber species availability, and contractor access all vary by county.

The Cost Transparency Guide

Not ready to start an estimate? Download our 24-page PDF guide. Covers every cost variable in a log home build — timber species, site access, settling systems, and maintenance decade-by-decade.

How to read a log home bid (and spot what's missing)
Species comparison: cedar vs. pine vs. spruce vs. fir
Settling: how much, how fast, and what breaks if you ignore it
Maintenance calendar, years 1–30
Questions to ask every builder before you sign

Email only. No phone calls, no follow-up sequence.

Licensed & Insured
MT, ID, OR, WY, CO
28 years building
Since 1998
84 homes built
0 lien claims
Client references
Available on request
We answer the phone.
Weekdays 7am–6pm MT · (406) 555-0184